The squad building the engine that moves law firms into platform v3: Lawhive Legal off v2, Woodstock off LEAP, and every firm after them. Each report links its review deck and the firm-migrations design docs.
| Sprint | Title | Date | Status |
|---|---|---|---|
| Sprint 2 |
Sprint 2 — End to End in Dev
Aug 19 → Sep 2 2026 · the stages met on a real environment: a real v2 matter (36 files, 92 staff records) was dumped raw, shaped and exported by the new one-click Dagster job, and imported into v3 on dev with every file byte placed. Activation became the architecture's fourth stage: five tech plans agreed, member-login verbs on trunk, the ingestion backfill lane proven end to end, and the file-activation chain staged as approved drafts. 64 PRs landed across 5 repos; two milestones closed to 100%. Review deck →
|
2026-09-02 | Draft |
| Sprint 1 |
Sprint 1 — The Migration Engine Takes Shape
Aug 6 → Aug 19 2026 · the squad's first sprint. The four-stage architecture was agreed and documented (14 design docs), the import service merged into platform-v3 (23 PRs, proven end to end on a 714-matter dev firm), the boundary-schema contract landed on both sides of the pipeline, and extraction and mapping started for both source firms. The operational track stood up the programme around it: project template with gates, RACI, data dictionary, testing plans. 39 of 68 tickets Done, git-verified. Review deck →
|
2026-08-19 | Final |